Undercrossing tunnels are frequently constructed by the shield-driven method in metro projects.Shield tunneling affects the existing tunnel inevitably.
The transit tunnel between station Dajuyuan and station Kexueguan of Shenzen metro passes through fluidal plastic clay soils which should be strengthened in advance before excavation.