Minish the well space and increase transflux routeways upper backwater and driving, especially setup precipitation well and drain residual water at the bottom of diving layer.
For lack of the theoretical calculation method at present,the skew bridge backwater is simulated in adopting circle pier and embank uncompressing river through hydraulic models.