有奖纠错
| 划词

In this paper the properties of the polymer modified cement mortar are studied of DIDY formwork concrete surface coated layer for protection.

本文主要对模网混凝土聚合物改性水保护层性能进,着重探讨了与耐久性密切相关抗裂性能和抗渗性能。

评价该例句:好评差评指正

用户正在搜索


hougher, houghite, Houghton, houmous, hounce, hound, hound dog, hounded, houndfish, hounding,

相似单词


3G, 401(K), a,

声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。

B1M筑科普

With the initial core walls poured, PERI's ACS Core 400 formwork system was maneuverered through One Vanderbilt's steel frame and installed.

在开始浇筑墙时,PERI 的 ACS Core 400 模板系统通过 One Vanderbilt 的钢框架进行操作和安装。

评价该例句:好评差评指正
CNN 阅读

3D printers can construct buildings without formwork (the concrete molds that cement is typically poured into), which can significantly reduce overall use of the material.

3D打印机可以在没有模板(通常用于灌注水泥的混凝土模具)的情况筑物,这可以显著减少材的总使用量。

评价该例句:好评差评指正
B1M筑科普

After careful planning, and with approvals in place from city authorities, formwork systems manufacturer PERI delivered One Vanderbilt's core forming system under the cover of darkness to avoid disruption.

经过划,并获得市政当局的批准,模板系统制商 PERI 在连夜交付了 One Vanderbilt 的核成型系统,以避免项目中断。

评价该例句:好评差评指正
B1M筑科普

However, forming the tower's core after the steel frame had been erected created further logistical challenges — with the core's formwork needing to be small enough to navigate through the steel structure to the core's location.

然而,在钢框架搭完成后,形成塔楼的核部分带来了进一步的后勤挑战——核模板需要足够小,才能穿过钢结构到达核部分的位置。

评价该例句:好评差评指正
B1M筑科普

As each storey of the core is completed, PERI's innovative climbing sequence transfers the load of the formwork system from the upper working brackets, shown here in red, to the lower climbing brackets, shown in yellow.

随着核层的每一层的完成,PERI 创新的攀爬顺序将模板系统的负载从上面的工作支架(这里显示为红色)转移到面的攀爬支架(这里显示为黄色)。

评价该例句:好评差评指正

用户正在搜索


housecleaner, housecleaning, housecoat, housecraft, housed, housedress, housefather, house-flannel, housefly, housefront,

相似单词


3G, 401(K), a,
  • 微信二维码

    关注我们的微信

  • 手机客户端二维码

    下载手机客户端

赞助商链接