According to the problems of WZ-C bell-less top charging equipment such as high temperature and perviousness of distributor.The causes are analyzed.The water cooling and block system are modified.
The maximum depth of the pit is mainly related to the inflow angle, unit discharge and the perviousness of the dike etc. with the maximum impact from the Unit discharge.