President Amadou Toumani Toure cut the ribbon for the building.At the completion ceremony of the building on December 1st, 2007 in the Presidential Palace.
This machine can motorise pay-off not only loose tube of optical fiber but also loose tube of optical fiber ribbon, and it can shut down once buldgy part is detected.