Analysis results show that location of pile neutral point is the lowest and downdrag caused by NSF is maximal if neglecting working load on pile top.
分析结果表明,不考虑桩顶荷载中性点位置是最低,力是最大。
Analysis results show that location of pile neutral point is the lowest and downdrag caused by NSF is maximal if neglecting working load on pile top.
分析结果表明,不考虑桩顶荷载中性点位置是最低,力是最大。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。