A plumber’s coming in to look at the boiler.
有位暖工要来看看热
器。
A plumber’s coming in to look at the boiler.
有位暖工要来看看热
器。
The engine is letting off steam to relieve the pressure in the boiler.
机车在放蒸汽, 以减少的气压。
Extruded magnesium anode are mainly used inwaterboiler,heatexchanger,vapourater,boiler,etc.lt has pro-perty of softingwater,de-dirtresidual,enlong the usinglife,span.
挤压镁阳极主要应用于热器、换热器、蒸发器、
等设备,有软化
质、排污除污、延长主机使用寿命等优点。
The boiler exploded and a big fire ensued.
"爆炸了,随着而来的就是一场大火。"
This new boiler generates more heat than the old one.
这个新产生的热量比旧
多。
This water is forced into the boiler by the feed pump.
用泵将
压入
。
First cut off the water flow from the boiler.
首先切断来自的
。
The building was destroyed when the defective boiler exploded.
个有毛病的
爆炸时,
座楼被炸毁了。
We want to buy a wetback boiler.
我们想买一台湿背式。
In order to save space, the back of the boiler had been let into the wall.
为了节省空间, 的背部被嵌进墙内。
Steam pressure exploded the boiler.
蒸汽的压力使爆炸了。
The control system will automatically transfer to this mode in the mode in the event of a boiler runback.
一旦自动减负荷时,该控制系统将会自动地切换到这一汽轮机跟随方式。
The harnessing of noise and smust to boiler are studied,pugging and ventilation are adopted to harnest noise of fan.
通过对煤矿噪声治理和烟尘治理的研究,阐述了通过采用隔声罩和机械通风冷却设施对引风机和鼓风机的降噪治理。
The technigue of staged coal combustion in underplate burning boiler is a mew method for energy saving and environment protecting.
层燃两段燃烧技术,是一种行之有效的节能、环保的新技术。
Distorsion,corrosion,erosion and abrasion mechanisms,concerning the faulty section,of the boiler s secondary superheater were studied by on-site measurements and by samples,cut from the tubes.
分别采取现场实测和割管取样2种方法对二次过热器的变形、腐蚀、冲刷与磨损等主要失效机理进行了分析,并由此得出预防管子失效的对策。
E—M water treatment agent for boilers,composed of ethylenediamine tetramethylene phosphonic acid(EDTMP) and hydrolyzed polymaleic anhydride (HPMA),and its applications are introduced in this article.
介绍由乙二胺四亚甲基膦酸(EDTMP)和解聚马来酸(HPMA)组成的
处理剂E—M配方及其应用实例。
A new turbine-boiler coordination control system is designed for the 600 MW supercritical monotube boiler manufactured by Haerbin Boiler Plant with British Mitsm Babcock technology.
针对哈尔滨厂引进英国三井巴布科克技术制造的600 MW超临界直
,设计了新型的机
协调控制系统。
Bench of closed circuit cooling tower that is composed of boiler ,exchanger, orifice flowmeter, water pump, micromanometer , heat indicator and so on is established.
建立了由、换热器、孔板
量计、
泵、微压计、温度计等仪器设备组成的封闭式冷却塔实验台。
The tube leakage of partition overheater of No. 2 boiler in a power plant was studied by means of metallography, intergranular corrosion test and EDS.
摘要针对日照电厂2(上标﹟)屏式过热器泄漏进行了金相试验、晶间腐蚀倾向性试验和电镜能谱分析。
This company is skilled in repairing and retubing variety of steel and shape boiler tubes on the worksite. Prompt delivery,quality and quantity assured,approved by Registers of Shipping.
该公司擅长各类船用的就地修理、更换各种钢质和管型的
管。修期短,质量好,得到各国船级社的认可。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。