It deals with lots of factors from the process of networks modeling, node demand calculation, initial flow distribution, and the optimal design to the drawing of pipe networks and isopiestic line.
文章分三部分分别管网优化计算、管网图形绘制和等压线图绘制方法。
It deals with lots of factors from the process of networks modeling, node demand calculation, initial flow distribution, and the optimal design to the drawing of pipe networks and isopiestic line.
文章分三部分分别管网优化计算、管网图形绘制和等压线图绘制方法。
声明:以上例句、词性分类均由互联网动生成,部分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。