the date should be the same as for bid submiss specified under ITB 19.1 above, and the time should also be the same as specified under ITB 19.1, or immediately thereafter.
日期应与上述19.1条规定递交投票书截止日期相同,时间应与上述19.1条规定递交投标书截止时间相同,或者紧随其后
the date should be the same as for bid submiss specified under ITB 19.1 above, and the time should also be the same as specified under ITB 19.1, or immediately thereafter.
日期应与上述19.1条规定递交投票书截止日期相同,时间应与上述19.1条规定递交投标书截止时间相同,或者紧随其后
声明:以上例句、词性分类均由互联网资源自动,分未经过人工审核,其表达内容亦不代表本软件观点;若发现问题,欢迎向我们指正。