GX tube probe was utilized to detect the underground location of a drillhole in Tuanbo mine of Huozhou mining bureau and good result was obtained.
阐述了霍州矿务局团柏矿利用GX管道5—1钻孔在井下位置,得较好效果。
On basis of this model, the modeling methods and modeling flow were discussed based on data source of geological observation, drillhole, ichnography and section map.
在此基础,了在基于地质观数据、钻孔数据、平面图数据、剖面图数据的断层建模方法和建模流程。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。
关注我们的微信
下载手机客户端
划词翻译
详细解释