Minish the well space and increase transflux routeways upper backwater and driving, especially setup precipitation well and drain residual water at the bottom of diving layer.
减距,增加上层滞水和潜水入流通道,尤其要在潜水含水层底板低洼处置降水将低洼处残留水引走。
声明:以上例句、词性分类均由互联网资源自动生成,部分未经过人工审核,其表达内容亦不代表本软件的观点;若发现问题,欢迎向我们指正。